Mason - North Shore - Great Bend

Project Number: 2319-01
From milepost 16.6 to milepost 16.7
RATA Funds: $500,000
Legislative District: 35
Status:
Date Approved: 2019
Great Bend Creek culvert is on the N. Shore road which is the life line to the Tahuya Peninsula.

The existing corrugated metal pipe was corroded and undersized. Debi would plug the inlet and cause flooding to the surrounding properties and county road.

The existing CMP was replaced with a concrete box culvert by county forces.