Yakima - Fort Road (Bridge #1353 Replacement)

Project Number: 3917-02
From milepost 12.96 to milepost 13.16
RATA Funds: $314,340
Legislative District: 15
Status: Construction
Date Approved: 2017
> Fort Road Bridge #1353 will be reconstructed to a 94-foot long by 40-foot wide configuration.
> Existing three-wood girder sub-structure will be replaced with a new seven (7) concrete girder design.
> Existing Wood Abutments will be replaced with concrete abutments
> New design will remove two existing water piers from Mud Creek footprint.
> Proposed Roadway width will widen from existing two, 12' lanes, 1' shoulder to 12' lanes, 8' shoulder configuration.
> Existing guardrail system to be replaced with current standard guardrail and traffic barriers.
> Relocate farm accesses to an approved safe distance from bridge structure.