Active Projects in Construction Phase

4-NE (N-NE to L-NE) Project

Grant County - 4-NE (N-NE to L-NE)

Project Number: 1315-02
From Milepost: 0.000 - To Milepost: 2.010
RATA funds: $ 995,400
Legislative District: 13
Status Construction
Date Approved: 2015

4-NE is a rural minor collector that runs east-west from N-NE to L-NE (RAP improved 2005). N-NE provides access to the Wheeler commercial/industrial corridor and L-NE provides access to Interstate 90. The section of 4-NE from L-NE to K-NE, aka Broadway Extended/State Route 171, that goes through the city of Moses Lake to Interstate 90 was RAP improved in 2010. This road carries a high percentage of truck traffic and is subject to seasonal weight restrictions. This section of road has a higher than average maintenance requirement. The project will widen the existing 24 foot wide BST surfaced road to 34 feet. Project work will include rotomilling, roadway excavation, embankment, crushed surfacing base and top course, HMA surfacing, drainage and permanent signing. Clear zone, side slopes and the roadside environment will be evaluated for hazard removal/mitigation.

  • active project photo
  • active project photo
  • active project photo
  • active project photo