Active Project Report

Gould City Mayview Phase 4 Project

Garfield County - Gould City Mayview Phase 4

Project Number: 1215-01
From Milepost: 13.840 - To Milepost: 16.581
RATA funds: $ 1,572,800
Legislative District: 9
Status Construction
Date Approved: 2015

This project is a continuation of Gould-City Mayview Road Phase I, Phase II and Phase III Projects. Phase 1 and 2 were completed in 2003 and 2005 respectively. Phase III is currently under design and anticipated to be constructed spring and summer 2015. The existing road is gravel and used extensively during the dryer periods for farm to market and access to Lower Granite Dam and Snake River. Lower Granite Dam traffic using this corridor originates from traffic coming from the west and onto Kiby-Mayview road. It is anticipated that once the road is upgraded to an all weather standard, the annual traffic rate will increase significantly because it will reduce the commuter time to Dam and Snake River dramatically. This Project is Phase 4 of 4 phases and includes horizontal and vertical alignment correction, drainage, BST, ballast, grading, signing, guardrail and hazard elimination. The existing alignment will be followed as much as possible with the exception of the area where hoizontal curve adjustments are required and at the end of the project where it will tie into Kirby-Mayview Road. No design deviations are anticipated at this time. The existing road is an 18' shoulder to shoulder gravel road, which will be reconstructed to a minimum 28' BST Road Surface ( 12' lanes, 2' shoulder.)

  • active project photo
  • active project photo
  • active project photo
  • active project photo
  • active project photo