Active Project Report

SNAKE RIVER ROAD Project

Asotin County - SNAKE RIVER ROAD

Project Number: 0209-03
From Milepost: 19.000 - To Milepost: 21.970
RATA funds: $ 3,772,940
Legislative District: 9
Status Construction
Date Approved: 2009

The existing roadway is a narrow gravel road with sub-standard vertical alignment, horizontal alignment, roadbed, and drainage. The Snake River runs next to the roadway and presents a hazardous situation as there is no guardrail on this section of the road.



The proposed project will improve roadway alignment and drainage, reconstruct and widen the roadway to 28 feet, apply a BST surface, and install guardrail. All aspects of the reconstruction will meet or exceed WSDOT standards.

  • active project photo