County Road Administration Board
  • Home
  • Administration
    • About CRAB
    • Accountability
      • Laws and Rules
    • Standards of Good Practice
    • Compliance
    • Reports
      • Annual Report
      • CFGS Report
      • MMS Report
  • Funding
    • Grant Programs
    • Motor Vehicle Fuel Tax
    • Property Tax
  • Engineering
    • Administration
      • Professional Development
      • Organizational
      • Personnel
    • Compliance
      • Training and Guidance
      • Policies
      • Technical
    • Operations
      • Construction
      • Preservation
      • Maintenance
  • Technology
    • Design Systems
    • Mobility Software
    • Training
      • Design Systems Training
      • Mobility Training
    • CRAB FTP Site
  • Counties
    • County Profiles (MRSC)
    • County Contacts
    • County Data Tables
    • County Job Links
  • Library
  • Contact
Search CRAB Web

Project Links

  • Grant Program Projects
  • Active Projects
  • RAP Current Project Funding
  • Project Lapsing Status
  • Completed 2000 - 2009
  • Completed Pre - 2000
  • Featured Projects
  • RATA Fund Expenditures

Related Links

  • Grant Programs
  • Construction
  • Preservation

Related Links

  • Grants Home
  • Projects
  • RAP Forms
  • RAP FAQ's
  • RAP Regions
  • Due Dates Calendar

 

 

Access Washington

 

Featured Project


FRANKLIN COUNTY - FILBERT ROAD

Project Summary
Project Images

Project Number: 1197-04
From Milepost: 1 To Milepost:4.34
RATA/CAPP funds: $ 720,000
Design Software: Eagle Point
Completed: 2003

The Preliminary Engineering phase of this project was worked on sporadically starting in April of 1999 with completion in May of 2001. Then we started the extremely gratifying Right-of-Way Phase of the project. This phase was completed, even with one landowner moving to Japan in the middle of negotiations, between May of 2001 and August of 2002. In the middle of right-of-way negotiations we decided that it would be necessary to complete the canal modifications necessary for the project while water was out of the canals. So we put out a separate contract for this work which was awarded and completed by Apollo, Inc., of Kennewick, WA, between January 31, 2002 and February 20, 2002 for $43,215.35. The main contract was awarded and completed by Hilmes Construction, of Othello, WA, between August 19, 2002 and July 31, 2003 (including work stoppage due to weather) for $661,182.52. Utilizing $720,000 in RATA funding, the total project also realigned horizontal and vertical curves, upgraded and added drainage structures applied crushed surfacing, and surfaced the road with a two (2) shot bituminous surface treatment

Click on project thumbnails to display larger images.

road project image road project image road project image road project image




CRAB point of contact for both RAP and CAPP programs is Randy Hart P.E., Grant Programs Manager, 360.753.5989


© Copyright 2009 County Road Administration Board - HomeSearchPrivacyAboutContactFeedback